Solar Panels in Easkey, Co. Sligo
Easkey is a village in Co. Sligo with a population of around 400. Located 31.4 km from Sligo, the area has a solar yield of 747 kWh/kWp. A 4kWp solar system generates approximately 2,988 kWh annually, saving an estimated €896+ per year. The SEAI grant of up to €1,800 and 0% VAT bring the net cost to €3,200–€6,200.
Easkey solar irradiance and generation figures
| Solar Metric | Value |
|---|---|
| Solar Yield | 747 kWh/kWp |
| 4kWp System Output | 2,988 kWh/yr |
| Sunshine Hours | 1,150 hrs/yr |
| Est. Annual Savings | €896+ |
| Household Coverage | 71% of avg use |
Solar yield calculated for Easkey (54.29°N, 8.96°W) using PVGIS satellite data. Actual output varies by roof orientation, shading, and system specification.
Monthly Solar Output in Easkey
kWh per month (4kWp system)
Easkey at a Glance
| Area Data | Value |
|---|---|
| Population | 400 (Census 2022) |
| Elevation | 15 metres |
| Eircode Area | F26 |
| Dist. to Sligo | 31.4 km |
| Location | Inland |
| Coordinates | 54.2854°N, 8.9599°W |
Population and housing data: CSO Census 2022. Weather data: Met Eireann (Markree, 35 km).
Weather & Climate in Easkey
Weather data from Met Eireann (Markree station, 35 km from Easkey). 5-year average (2019–2023).
Renewable Energy Potential in Easkey
Easkey is a village in Co. Sligo with a population of 400 (CSO Census 2022). It is accessible from Sligo (31.4 km), where most SEAI-registered installers in the county are based. The Eircode routing key for Easkey is F26. You'll need your full Eircode when applying for the SEAI grant. Based on satellite data for this location, a 4kWp solar system generates approximately 2,988 kWh per year (747 kWh/kWp). The area has higher rainfall (1332 mm/yr), with a mean temperature of 9.8°C.
Why Go Solar in Easkey?
Save on Electricity Bills
Homeowners in Easkey can save an estimated €896+ per year on electricity with a 4kWp solar system generating 3,388 kWh annually.
SEAI Grant: Up to €1,800
Get up to €1,800 back from SEAI. The grant is available for homes built before 2021. No means testing. Apply online at seai.ie.
0% VAT on Installation
Residential solar installations are zero-rated for VAT since May 2023, saving approximately €1,000 on a typical system.
Earn from Excess Energy
Sell surplus electricity at 15-25c/kWh through the Microgeneration Support Scheme. The first €400/year is tax-free.
Energy Independence
For homes in rural Easkey, solar panels provide energy security and reduced reliance on the grid. Combined with a battery, you can store power for evening use.
25+ Year Lifespan
A system installed in Easkey today will generate clean electricity for 25-30 years with minimal maintenance.
SEAI Solar Grant for Easkey Residents
Homeowners in Easkey, Co. Sligo can apply for the SEAI solar PV grant. The maximum grant of €1,800 is confirmed for 2026.
| System Size | Grant Amount | Typical Net Cost |
|---|---|---|
| 2 kWp | €1,400 | €2,000 - €3,000 |
| 3 kWp | €1,600 | €2,500 - €4,000 |
| 4 kWp+ | €1,800 (max) | €3,200 - €6,200 |
Solar Installers in Sligo
SEAI registered solar panel installers covering Sligo.
Top Rated Solar Installers Near Easkey
Read verified reviews from solar panel installers serving Easkey, Co. Sligo.
Nearby Towns Also Served
Also serving nearby areas in Sligo:
Find Solar Installers in Sligo
Browse SEAI-registered installers covering Easkey and all of Sligo.
Easkey solar panel questions answered
How much do solar panels cost in Easkey?
A 4kWp system in Easkey typically costs €5,000-€8,000 before grants. After the €1,800 SEAI grant and 0% VAT, the net cost is €3,200-€6,200. The system generates approximately 3,388 kWh/year, paying for itself in 4-6 years.
What is the Microgeneration Support Scheme?
The Microgeneration Support Scheme allows homeowners to sell surplus solar electricity back to the grid at 15-25c/kWh. You need a smart meter (free from ESB Networks) and a grid-connected system. The first €400/year of export income is tax-free.
How long do solar panels last?
Modern solar panels are warrantied for 25-30 years and typically last even longer. Panel efficiency degrades by about 0.5% per year, so after 25 years, your panels will still produce around 87% of their original output. Inverters typically last 10-15 years and may need one replacement.
Can I get solar panels on an east or west facing roof in Easkey?
Yes. East or west-facing roofs still produce 80-85% of the output of a south-facing roof. Many installers recommend splitting panels across east and west to spread generation throughout the day, which can actually improve self-consumption.
What is a BER assessment and do I need one?
A Building Energy Rating (BER) assessment is required after installing solar panels to claim the SEAI grant. A BER assessor visits your home and rates its energy efficiency from A1 to G. Solar panels typically improve your BER by 1-2 grades. The assessment costs around €150-€200.
How much electricity will solar panels generate in Easkey?
Based on Sligo county data, a 4kWp system in Easkey generates approximately 3,388 kWh per year, covering 71% of average household use (4,200 kWh/year). Sligo receives around 1,150 sunshine hours annually.
How long does solar panel installation take?
A typical residential installation takes 1-2 days. This includes scaffolding, mounting the panels, wiring, inverter installation, and connecting to the grid. Your installer handles the ESB Networks notification (NC6 form).
Sources
- SEAI — Solar Electricity Grant
- SEAI — Find a Registered Professional
- Revenue — 0% VAT on Solar Panels
- PVGIS — EU Joint Research Centre (solar irradiance data)
- CSO — Census of Population 2022
- Met Eireann — Climate Data
Last updated: March 2026
Fact-checked by John Rooney, Solar Energy Editor. Editorial policy
Get a Free Solar Quote in Easkey
Connect with SEAI-registered installers covering Easkey, Co. Sligo.