Skip to main content
Ireland's Commercial Solar Comparison

Get Commercial Solar Quotes from Experienced Installers in Ireland

Compare prices from SEAI-registered commercial solar installers across Ireland. For businesses, farms, factories, and agricultural sites.

Quotes from a small number of installersTAMS 3 & ACA expertise for farmsSEAI grant up to €325,200 until July 2027

How It Works

Get competing quotes from experienced commercial solar installers in 3 simple steps.

Step 1

Answer a Few Questions

Tell us about your property and needs — takes under 60 seconds.

Step 2

Get Your Quotes

We match you with SEAI-registered commercial solar installers with experience at your scale.

Step 3

Choose & Save

Compare quotes, pick the best deal, and access grants up to €325,200 plus ACA tax relief.

Why Compare Quotes?

Prices Vary by Tens of Thousands

Commercial solar quotes can vary by €20,000+ for the same size system. Installer experience, component quality, and system design all affect long-term yield — compare to avoid overpaying or underspec'ing.

Unlock Multiple Grants

SEAI Non-Domestic Microgen grant (up to €325,200 until 6 July 2027), TAMS 3 (farms, up to 60%), and ACA (100% first-year capital allowance) can stack to cut net cost dramatically. Experienced installers guide the paperwork.

Payback in 3–4 years

Most commercial systems pay back in 3–4 years with the SEAI grant. Businesses with high daytime electricity use see faster payback because they self-consume more generation.

Selling Surplus Power

Systems up to 6 kW get the Clean Export Guarantee rate of about 18–21c per kWh. Above 6 kW, businesses sell surplus on a negotiated export contract, typically about 10c per kWh (7c for systems over 200 kWp). Export pays far less than the electricity you avoid buying, so a well-designed commercial system is sized for self-consumption.

Commercial Solar Costs in Ireland (2026)

Typical ranges — exact price depends on roof type, grid connection, and installation complexity.

System SizeTypical SiteInstall CostAfter GrantsPayback
20 kWpSmall shop / office€24,000–€30,000€13,200–€16,8003–4 yrs
50 kWpSME / medium farm€50,000–€65,000€27,500–€39,8003–4 yrs
100 kWpWarehouse / large farm€100,000–€130,000€55,000–€84,8003–4 yrs
250 kWpFactory / dairy€212,500–€262,500€116,875–€162,3003–4 yrs
500 kWp+Large industrial€425,000+€249,800+3–4 yrs

Costs ex VAT. After Grants and Payback use the SEAI Non-Domestic Microgen grant in force now (up to €325,200 until 6 July 2027, the lower of the band value or 45% of cost) and assume 75% of output is used on site. TAMS 3 up to 60% for farms, ACA 100% first-year tax allowance. 2026 estimates.

Frequently Asked Questions

How much does commercial solar cost in Ireland?

Commercial solar systems typically cost €700–€1,500 per kWp installed (ex VAT), with smaller systems at the upper end. A 50 kWp system for a small business runs €50k–€65k, while a 500 kWp system for a larger site runs €425k–€525k. SEAI Non-Domestic grant covers up to €325,200 until 6 July 2027, plus ACA 100% first-year capital allowance reduces tax bill.

What grants are available for commercial solar?

Businesses can access the SEAI Non-Domestic Microgen grant (up to €325,200 on systems up to 1,000 kWp, for applications until 6 July 2027) and the Accelerated Capital Allowance scheme (100% first-year tax write-off). Farmers may also qualify for TAMS 3 grants of up to 60% for solar under the Solar Capital Investment Scheme.

What's the payback period?

Most commercial systems pay back in 3–4 years with the SEAI grant, or 5–8 years without it. Businesses with high daytime electricity use (factories, farms, offices) see faster payback because they self-consume more of the generated power.

Is this service really free?

Yes, 100% free. There are no fees and no obligation to accept any quote.

Can I sell excess electricity back to the grid?

Yes. Systems up to 6 kW get the Clean Export Guarantee rate of about 18–21c per kWh. Above 6 kW, businesses sell surplus on a negotiated export contract, typically about 10c per kWh (7c for systems over 200 kWp).

How long does installation take?

Commercial installations typically take 2–6 weeks depending on system size and roof/ground complexity. Grid connection timelines depend on ESB Networks.

Also looking for something else?

Solar Info has tracked Ireland's SEAI-registered installer network since 2024. Read our editorial policy or about us.

Ready to Get Your Commercial Solar Quotes?

Businesses and farms across Ireland are cutting energy costs with solar. Free, fast, and no obligation.