Skip to main content

Solar Panels in Beltra, Co. Sligo

Beltra is a village in Co. Sligo with a population of around 400. Located 11.2 km from Sligo, the area has a solar yield of 735 kWh/kWp. A 4kWp solar system generates approximately 2,940 kWh annually, saving an estimated €882+ per year. The SEAI grant of up to €1,800 and 0% VAT bring the net cost to €3,200–€6,200.

Grant up to €1,800
0% VAT
1,150+ sunshine hrs/yr

Get a Free Quote in Beltra

Find out how much you could save with solar panels.

No obligation. SEAI grant eligible. 0% VAT on residential installs.

All installers verified against the SEAI register.

What is the solar potential in Beltra?

Solar MetricValue
Solar Yield735 kWh/kWp
4kWp System Output2,940 kWh/yr
Sunshine Hours1,150 hrs/yr
Est. Annual Savings882+
Household Coverage70% of avg use

Solar yield calculated for Beltra (54.22°N, 8.62°W) using PVGIS satellite data. Actual output varies by roof orientation, shading, and system specification.

Monthly Solar Output in Beltra

49
Jan
107
Feb
227
Mar
370
Apr
461
May
451
Jun
417
Jul
359
Aug
251
Sep
146
Oct
66
Nov
35
Dec

kWh per month (4kWp system)

Beltra at a Glance

Area DataValue
Population400 (Census 2022)
Elevation5 metres
Eircode AreaF91
Dist. to Sligo11.2 km
LocationInland
Coordinates54.2194°N, 8.6175°W

Population and housing data: CSO Census 2022. Weather data: Met Eireann (Markree, 11.6 km).

Beltra Location

View larger map

Weather & Climate in Beltra

1,332
Rainfall mm/yr
9.8°C
Mean temperature
735
kWh/kWp solar yield

Weather data from Met Eireann (Markree station, 11.6 km from Beltra). 5-year average (2019–2023).

Solar Power in Beltra, Co. Sligo

Beltra is a village in Co. Sligo with a population of 400 (CSO Census 2022). It is a short drive from Sligo (11.2 km), where most SEAI-registered installers in the county are based. The Eircode routing key for Beltra is F91. You'll need your full Eircode when applying for the SEAI grant. Based on satellite data for this location, a 4kWp solar system generates approximately 2,940 kWh per year (735 kWh/kWp). The area has higher rainfall (1332 mm/yr), with a mean temperature of 9.8°C.

Advantages of Solar Energy for Beltra Homeowners

Save on Electricity Bills

Homeowners in Beltra can save an estimated €882+ per year on electricity with a 4kWp solar system generating 3,388 kWh annually.

SEAI Grant: Up to €1,800

Get up to €1,800 back from SEAI. The grant is available for homes built before 2021. No means testing. Apply online at seai.ie.

0% VAT on Installation

Residential solar installations are zero-rated for VAT since May 2023, saving approximately €1,000 on a typical system.

Earn from Excess Energy

Sell surplus electricity at 15-25c/kWh through the Microgeneration Support Scheme. The first €400/year is tax-free.

Increase Property Value

Solar panels improve your BER rating and can add up to 4% to your property value.

25+ Year Lifespan

A system installed in Beltra today will generate clean electricity for 25-30 years with minimal maintenance.

Solar grants available in Beltra

Homeowners in Beltra, Co. Sligo can apply for the SEAI solar PV grant. The maximum grant of €1,800 is confirmed for 2026.

System SizeGrant AmountTypical Net Cost
2 kWp€1,400€2,000 - €3,000
3 kWp€1,600€2,500 - €4,000
4 kWp+€1,800 (max)€3,200 - €6,200

Solar Installers in Sligo

SEAI registered solar panel installers covering Sligo.

Top Rated Solar Installers Near Beltra

Read verified reviews from solar panel installers serving Beltra, Co. Sligo.

Areas around Beltra we serve

Also serving nearby areas in Sligo:

Find Solar Installers in Sligo

Browse SEAI-registered installers covering Beltra and all of Sligo.

Your solar questions for Beltra

How much do solar panels cost in Beltra?

A 4kWp system in Beltra typically costs €5,000-€8,000 before grants. After the €1,800 SEAI grant and 0% VAT, the net cost is €3,200-€6,200. The system generates approximately 3,388 kWh/year, paying for itself in 4-6 years.

How long does solar panel installation take?

A typical residential installation takes 1-2 days. This includes scaffolding, mounting the panels, wiring, inverter installation, and connecting to the grid. Your installer handles the ESB Networks notification (NC6 form).

Are solar panels worth it in Beltra?

Yes. With estimated savings of €882+ per year, the €1,800 SEAI grant, 0% VAT, and export income of 15-25c/kWh, a solar system in Beltra pays for itself in 4-6 years and lasts 25+ years.

Do I need planning permission for solar panels?

Most residential solar installations are exempt from planning permission, provided panels don't project more than 15cm from the roof and don't cover more than 50% of total roof area.

How long do solar panels last?

Modern solar panels are warrantied for 25-30 years and typically last even longer. Panel efficiency degrades by about 0.5% per year, so after 25 years, your panels will still produce around 87% of their original output. Inverters typically last 10-15 years and may need one replacement.

Do solar panels increase property value in Beltra?

Yes. Solar panels improve your BER rating and can increase property value by up to 4%. Buyers increasingly look for energy-efficient homes with lower running costs. A solar system in Beltra is a long-term investment in your property.

Do solar panels work in winter in Sligo?

Yes, solar panels generate electricity all year round. While output is lower in winter, Sligo still receives usable daylight hours even in December. Annual generation figures (3,388 kWh for a 4kWp system) already account for seasonal variation.

Sources

Last updated: March 2026

Fact-checked by John Rooney, Solar Energy Editor. Editorial policy

Get a Free Solar Quote in Beltra

Connect with SEAI-registered installers covering Beltra, Co. Sligo.

Get a Free Quote in Beltra

Find out how much you could save with solar panels.

No obligation. SEAI grant eligible. 0% VAT on residential installs.

All installers verified against the SEAI register.

Get My Free Quotes